Sign In | Join Free | My vivirlatino.com
Home > Three Lobe Roots Blower >

Unique Impeller Three Lobe Roots Blower , IP55 Insulation High Efficiency Blower

GSD Industrial Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Unique Impeller Three Lobe Roots Blower , IP55 Insulation High Efficiency Blower

Brand Name : GSD
Model Number : GRB
Certification : CE,ISO,SPAN,ECA
Place of Origin : CHINA
MOQ : Negotiation
Price : Negotiation
Payment Terms : T/T
Supply Ability : 1000 sets per three monthes
Delivery Time : Four weeks
Packaging Details : Plywood case
Material : HT250
Diameter : 32-400mm
Capacity : 0.56-286.67m³/min
Blower Speed : 600rpm-3000rpm
Motor Type : TEFC
Insulation : IP55
Contact Now

Unique Impeller Three Lobe Roots Blower , IP55 Insulation High Efficiency Blower


Applications:

  • Waste water treatment system;
  • Oxygenating and aeration;
  • Flue gas desulfurization;
  • Fermenting Plant;
  • Car Washing;
  • Paper mill;

Features:

  • GRB is a displacement blower, the pressure can be adjusted according to the requirement of the user in allowing range
  • There are two impellers in the blower body which rotate in the opposite direction
  • There are some tiny gap between the impeller to body, impeller to impeller which ensures the impeller rotate
  • High efficiency due to special impeller design, great air delivery low power
  • Simpler and solider structure, less trouble
  • Highest quality pilot and highly accurate, long life and low noise assured

Performance Parameters:


ModelRPM1000mmAq2000mmAq3000mmAq4000mmAq
QsLaNQsLaNQsLaNQsLaN
GRB-3215000.560.171.100.510.281.100.470.401.100.430.511.10
17500.680.201.100.620.331.100.580.461.100.550.591.10
20000.790.231.100.740.381.100.700.531.100.660.681.10
23000.930.261.100.880.431.100.840.611.100.800.781.10
26001.070.291.101.020.491.100.970.681.100.940.881.50
30001.250.341.101.200.561.101.160.791.101.121.021.50
ModelRPM1000mmAq2000mmAq3000mmAq4000mmAq
QsLaNQsLaNQsLaNQsLaN
GRB-408501.020.421.100.890.641.100.790.851.500.711.071.50
9501.180.471.101.050.711.100.950.951.500.861.202.20
10501.330.521.101.200.791.101.101.061.501.021.322.20
11501.490.571.101.360.861.501.261.162.201.181.452.20
12501.650.621.101.520.941.501.421.262.201.331.582.20
13501.800.671.101.671.011.501.571.362.201.491.702.20
14501.960.711.101.831.091.501.731.462.201.651.833.00
15502.120.761.101.991.162.201.891.562.201.801.953.00
16502.270.811.102.141.242.202.041.662.201.962.083.00
17502.430.861.502.301.312.202.201.763.002.122.213.00
18502.590.911.502.461.392.202.361.863.002.272.333.00
19502.740.961.502.611.462.202.511.963.002.432.463.00
ModelRPM1000mmAq2000mmAq3000mmAq4000mmAq
QsLaNQsLaNQsLaNQsLaN
GRB-508501.810.611.101.640.971.501.521.342.201.411.702.20
9502.070.681.101.911.091.501.781.492.201.671.903.00
10502.340.751.102.171.202.202.041.652.201.932.103.00
11502.600.821.502.431.322.202.301.813.002.192.303.00
12502.860.901.502.691.432.202.561.963.002.452.503.00
13503.120.971.502.951.542.202.822.123.002.712.704.00
14503.381.041.503.211.662.203.082.283.002.972.904.00
15503.641.111.503.471.773.003.342.433.003.233.104.00
16503.901.182.203.731.893.003.612.593.003.503.304.00
17504.161.262.204.002.003.003.872.754.003.763.505.50
18504.431.332.204.262.123.004.132.914.004.023.705.50
19504.691.402.204.522.233.004.393.064.004.283.895.50

Points for attention before starting equipment

  • Check whether there are foreign matters in the piping, gas leakage in joint part, and whether it is tightened
  • Check whether the wiring mode, voltage, frequency etc. conform to motor nameplate
  • Confirm whether the oil levels of both front and rear oil tanks are in the center of mirror surface of oil tank

Assembly and disassembly of blower

The correct position and assembly relation of all parts of blower can be seen clearly in the 3D artificial picture; it is not difficult for experienced technician to do general assembly and disassembly (except drive rotor and driven rotor) of it. In case of necessary disassembly of machine, before starting, fault position should be analyzed and judged correctly, then the 3D artificial picture should be referred to for the sequence of disassembly →replacement of corresponding parts → restoration. Before removing the oil tank, the oil should be discharged before removal, and appropriate tool should be selected, such as hook wrench and screwdriver for round nut removal. Fastening screw should be used for separating bearing seat from the body; forceful separation by hammer beating should not be used to avoid machine damage. The assembly and disassembly of bearing also requires appropriate auxiliary tools. The bearing steel ring should not be hit with hammer directly.


GSD Work Shop:



Product Tags:

3 lobe roots blower

      

tri lobe roots blower

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Unique Impeller Three Lobe Roots Blower , IP55 Insulation High Efficiency Blower Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: GSD Industrial Co., Ltd.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0