Sign In | Join Free | My vivirlatino.com
Home > Self Priming Sewage Pump >

Compact Self Priming Horizontal End Suction Pump SUS316 For Municipal Sewage Water

GSD Industrial Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Compact Self Priming Horizontal End Suction Pump SUS316 For Municipal Sewage Water

Brand Name : GSD
Model Number : GMP
Certification : ISO CE
Place of Origin : CHINA
MOQ : Negotiation
Price : Negotiation
Supply Ability : 2000 UNITS PER MONTH
Delivery Time : 2-3 WEEKS
Packaging Details : PLYWOOD CASE
Motor : IEC standard
PH value : 5 - 7
Temperature : 80 ℃
Motor voltage : 380v , 400v , 415v , 460v
Inlet / Outlet : 50 - 150 mm ( 2 - 6 in )
Speed : 1450 rpm , 2900 rpm
Contact Now

Compact Self Priming Horizontal End Suction Pump SUS316 For Municipal Sewage Water​


Application

A. Industrial water supply and drainage.

B. Building site water supply and drainage.

C. For municipal sewage water


Features

A. High efficiency, compact design

B. Mechanical seal to prevent damaging from the shaft and life extension.

C. Special construction for the pump casing, high self priming capability.

D. Low noise

E. Acid alkali resistance, and comply with sanitary requirements for foods.

F. Stable operation


Construction

No.NameMaterial (GB)Material (JIS)
1BaseQ235ASS400
2Pump bodyHT200FC200
3PlugQ235ASS400
4GasketsNBRNBR
5CoverHT200FC200
6ImpellerHT200FC200
7CheckNBRNBR
8Check baseHT200FC200
9O-RingNBRNBR
10Seal ringZCuSn10Pb5Tin-Bronze
11BracketHT200FC200
12Motor--
13Mechanical SealSic-SicSic-Sic
14Key3Cr13SUS420J2
15Lock washer0Cr18Ni9SUS304
16Impeller Nut0Cr18Ni9SUS304
17SeparatorHT200FC200

Performance parameter

Model No.MotorPumpWeight
PowerSpeedDiameterHeadFlow
HpkWr/minmminml/minm3/hkg
GMP 31-5010.751450502"82001260/81
GMP 32-6521.51451652.5"94162576/102
GMP 33-8032.21452803"970042105/128
GMP 35-8053.71453803"1275045114/145
GMP 37-10075.514541004"13120072175/262
GMP 310-100107.514551004"14160096248/297
GMP 315-150151114561506"152400144306/346
GMP 320-150201514571506"182800168322/375

Installation of the Water Pump

1. When the installation is carried out, first check the pump body and confirm that there is no sundries.

2. Place the machine group of the water pumps on the foundation, insert iron cushion between the foundation surface and bottom surface of the base and let the water pump reach the designed levelness and elevation by adjusting the thickness of the iron cushion; increase the stability of the water pump and provide convenience for the second grouting. Be noted that the iron cushion shall be placed at two sides of the foundation bolt, if only placed at one side of the bolt, one size bigger iron cushion shall be selected according the diameter of the foundation bolt. Inclined iron cushion shall be used in pairs.

3. The surface of the iron cushion must be level, the iron cushion number of each group is generally no less than 3 to 4 pieces, thick iron cushions are placed on the lower layers, the thickest one shall be clipped in the middle, and the iron cushions of the same group must be kept in order. The levelness and direction of the water pump shall be adjusted well, then the iron cushions of each group shall be welded and fixed well. During the adjustment of the levelness, the adjustment of the foundation bolt shall be adjusted at the same.

4. Embed the foundation bolt into the reserved hole on the foundation, check again if its direction precision is accurate, then grout adequate mortar into the space between the base and foundation concrete so as to form the structural parts of the concrete. The opening size of the reserved hole of the foundation bolt shall be subject to the diameter of the bolt. For bolts with a diameter between 12 and 30, the specification of the reserved hole shall be 100mm×100mm, and the depth of the hole is determined by the length of the bolt.

5. For the breakdown of the mortar, No. 400 cement matches 1:2 ~ 1:3 sand appears commonly. Special attention shall be paid to contractive crack and relevant norms on construction. The nut of the foundation bolt shall only be tightened after sufficient hardening of the mortar.

6. When the water pump is installed on the vibration isolating materials such as vibration isolator or vibration isolating pad, the vibration isolating materials shall be arranged with the position of center of gravity that passes the water pump machine group as the center. Although the adaptation of the vibration isolating materials may prevent the vibration on the foundation, the vibration of the water pump itself is a little increased.

7. In order to ensure the safe running of the water pump, external loads such as pipe lines, valves, frameworks are not allowed to be born; such loads must try to be carried with the support. Flexible coupling or bellows shall be installed on the inlet pipe and drain pipe so as to eliminate the influence brought by the vibration of pipe lines and heat deformation.

8. The power line and ground line shall be connected correctly according to the connecting way marked on the name plate of the electrical machinery.

9. Each connecting bolt shall be fastened (as they may be loosened during the transport and carrying process).

10. Try to hide the electrical machinery when welding the pipe lines so as to prevent the

high-temperature welding slag from entering the fan of the electrical machinery and burn it.


Wrok shop




Product Tags:

self priming sump pump

      

self priming dirty water pump

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Compact Self Priming Horizontal End Suction Pump SUS316 For Municipal Sewage Water Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: GSD Industrial Co., Ltd.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0